Summary: The purpose of this stakeholder group meeting was to provide an update on the
development of the implementation plan modeling tool (IP Modeling Tool) and the draft
baseline conditions analysis. The team walked the stakeholders through the development of the IP Modeling Tool, which includes modules for runoff, pollutant load and BMPs. Although this was presented at a previous stakeholder meeting, the team provided a brief overview of the modules and the input decisions that have been made since the last meeting. There are three main components of the modeling, including the runoff module, the pollutant load module, and the BMP module.